The right decision
starts with an expert.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Hot air generation with a burner-fired design that operates without water.
One combustion chamber; burner-fired design with no burn pot. The maximum outlet air temperature is 120 °C; higher temperatures require a special design.
For HAS NG, we assess your facility’s heat demand, inlet air temperature, target outlet temperature and required airflow together. We plan the unit as an integrated hot air system, encompassing fuel supply, combustion air, clean air circulation, distribution ducts and the flue connection.
We select the burner, fuel preparation equipment and supply pipework to suit the properties of the liquid or gaseous fuel. The design accounts for the burner’s air requirements, equipment room ventilation and flue operating conditions. Fuel types and any backup fuel arrangements depend on the selected burner and system equipment.
We select the circulation fan for the heated clean air, duct routes and distribution points together, based on the required airflow and duct resistance. We address the combustion gas and clean air paths separately. We do not assume that maximum thermal output, maximum airflow and an outlet temperature of 120 °C can all be achieved at the same operating point; requests for higher temperatures are assessed as a special design.
The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.
HAS NG is designed for hot air generation with a three-pass, fire-tube construction that operates without water. Fuel preparation, combustion and heat transfer are engineered together according to the selected capacity and the facility’s operating conditions.
Capacity and construction | |
|---|---|
| Thermal output range | 200,000–1,000,000 kcal/h |
| Airflow rate | 5,000–50,000 m³/h |
| Outlet air temperature | Up to 120 °C; higher temperatures require a special design |
| Construction | No water circuit · Three-pass · Fire-tube |
| Combustion chamber | Single |
| Number of burn pots | None; burner-fired |
| Fuel | Liquid / gas fuel |
| Fuel feeding / combustion | Burner selected for the order |
| Manufacturing | Engineered to order |
| Product family | Industrial Air Heaters |
Material standards | |
| Steel plate grades used in manufacturing | EN 10025-2 grade S355JR, S235JR |
| Fire and smoke tubes | EN 10217-2 or EN 10216-2 grade P235GH |
The series is engineered to order within a thermal output range of 200,000–1,000,000 kcal/h. These are the limits of a series of units manufactured at different capacities; they do not represent the load adjustment range of a single unit. Final capacity, operating conditions and equipment scope are determined for each project.
Liquid or gaseous fuel is delivered to the burner through a supply line suited to the selected fuel. Gas supply pressure and flow conditions, and liquid fuel storage and flow characteristics, are assessed alongside burner selection. The scope of filtration, regulation and any necessary fuel preparation equipment is determined in the project.
The burner must be compatible with the fuel type. As the equipment required for different liquid and gaseous fuels may vary, a single burner must not be assumed to operate with every fuel.
The burner fan supplies the air needed for combustion. At startup, safety conditions are checked and the combustion chamber is pre-purged. During ignition, gaseous fuel is delivered to the combustion head, while liquid fuel is atomized and mixed with air.
Combustion is monitored by the flame supervision system. Fuel and air quantities are adjusted according to the selected burner’s control method and heat demand. During shutdown, fuel supply is cut off and post-purge is completed according to the burner’s control sequence.
Hot gases produced in the combustion chamber travel through the three-pass fire-tube construction. Reversal sections direct the gases into the next pass, allowing the hot gases to contact the heat transfer surfaces before reaching the outlet.
Heat from the gases is transferred to the clean air flowing on the other side of these surfaces. Heated air and combustion gases are kept in separate flow paths. Cleaning the flue gas passages, checking deposits on heat transfer surfaces and providing maintenance access form part of the operating plan.
After the heat transfer section, combustion gases flow towards the flue connection. Flue and duct dimensions, gas flow rate and system pressure losses are assessed together.
The circulation fan moves the air to be heated across the heat transfer surfaces. The heated clean air is sent to the area of use or the process air ducts. This circulating air is considered separately from the combustion air and the gases discharged through the flue.
HAS NG operates without water; it does not use boiler water as a heat transfer medium. The series airflow range is 5,000–50,000 m³/h. The maximum outlet air temperature is 120 °C; higher temperatures require a special design. Airflow, duct resistance and target temperature are selected together.
To limit heat loss, hot surfaces are protected with insulation and external cladding suited to the design conditions. Insulation material, thickness and cladding details are determined by the operating temperature and order scope.
Maintenance access is required to the combustion system, heat transfer surfaces and flue connections. Service clearances around the equipment, door opening directions and cleaning areas are considered when preparing the facility layout.
A suitable burner and fuel preparation system are selected for natural gas, LNG, CNG, LPG, diesel and fuel oil. For methane and biogas, gas composition, treatment requirements and burner compatibility are assessed separately. A single burner must not be assumed to support every fuel.
Open the unit converterAll other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. This affects fuel feeding, the combustion chamber, heat transfer surfaces and, at the design stage, air heater dimensions.
At ENORPA, we design the air heater around the selected fuel and target capacity. An existing air heater cannot deliver the same thermal output with every fuel. Achievable capacity is determined by assessing fuel properties, the burner or feeding system, and air heater design together.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Within the series’ thermal output range of 200,000–1,000,000 kcal/h, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.
A burner is selected for the order. One combustion chamber; burner-fired design with no burn pot. The maximum outlet air temperature is 120 °C; higher temperatures require a special design.
These values must not be assumed to occur together at the same operating point. Thermal output, inlet air temperature and airflow are calculated together. Outlet temperatures above 120 °C require a special design.
You can choose the air heater body alone, supply with auxiliary equipment, or a solution covering the equipment room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.
Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.
The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.
Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.
An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.