The right decision
starts with an expert.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
A burner-fired solution for your facility’s water heating requirements.
Burner-fired construction for hot water and high-temperature hot water applications. No solid-fuel grate is fitted.
For Akuamarin, we assess your facility’s hot water or high-temperature hot water requirements, target supply and return temperatures, and operating pressure together. We plan the boiler with equipment that works as a coordinated system, from fuel feeding and water circulation to combustion air and the flue connection.
We select the burner, fuel preparation equipment and supply pipework to suit the properties of the liquid or gaseous fuel. The design accounts for the burner’s air requirements, boiler room ventilation and flue operating conditions. Fuel types and any backup fuel arrangements depend on the selected burner and system equipment.
We engineer the water supply, return and expansion lines together with circulation, temperature control and pressure safety equipment. We determine hot water or high-temperature hot water operating conditions to suit the installation’s requirements, treating water quality, adequate circulation and maintenance access as part of the design.
The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.
Akuamarin is designed for hot water and high-temperature hot water applications with a fully cylindrical, Scotch-type, three-pass, fire-tube construction. Fuel preparation, combustion and heat transfer are engineered together according to the selected capacity and the facility’s operating conditions.
Capacity and construction | |
|---|---|
| Thermal output range | 510–20,000 kW |
| Operating pressure | 1–16 barG |
| Operating water temperature | Engineered to suit hot water or high-temperature hot water requirements |
| Construction | Fully cylindrical · Scotch type · Three-pass · Fire-tube |
| Fuel | Liquid / gas fuel |
| Fuel feeding / combustion | Burner selected for the order |
| Manufacturing | Engineered to order |
| Product family | Hot Water & High-Temperature Hot Water Boilers |
Material standards | |
| Boiler steels In high-pressure sections: | EN 10028-2 grade P355GH, P295GH, P265GH and P235GH |
| Steel grades In non-pressurized or low-pressure sections: | EN 10025-2 grade S355JR, S235JR |
| Fire and smoke tubes | EN 10217-2 or EN 10216-2 grade P235GH |
The series is engineered to order within a thermal output range of 510–20,000 kW and an operating pressure range of 1–16 barG. These are the series limits of units that can be manufactured at different capacities; they do not represent the load adjustment range of a single unit. Final capacity, operating conditions and equipment scope are determined for each project.
Liquid or gaseous fuel reaches the burner through a supply line suited to the selected fuel. Gas supply pressure and flow conditions, and liquid fuel storage and flow characteristics, are assessed alongside burner selection. The scope of filtration, regulation and any necessary fuel preparation equipment is defined in the project.
Compatibility between the burner and the fuel type is essential. As different liquid and gaseous fuels may require different equipment, a single burner must not be assumed to operate with every fuel.
The burner fan supplies the air required for combustion. At startup, safety conditions are checked and the combustion chamber is pre-purged. During ignition, gaseous fuel is delivered to the combustion head, while liquid fuel is atomized and mixed with air.
Combustion is monitored by the flame supervision system. Fuel and air quantities are adjusted according to the selected burner’s control method and heat demand. During shutdown, fuel supply is cut off and post-purge is completed according to the burner’s control sequence.
Hot gases produced in the combustion chamber travel through the three-pass fire-tube arrangement. Reversal sections direct the gases into the next pass, allowing them to contact the heat transfer surfaces before reaching the outlet.
Energy from the hot gases is transferred to the boiler water surrounding the fire and smoke tubes and combustion surfaces. Cleaning the flue gas passages, checking deposits on heat transfer surfaces and providing maintenance access form part of the operating plan.
After the heat transfer section, combustion gases flow towards the flue connection. Flue and duct dimensions, gas flow rate and the system’s pressure losses are assessed together.
Water returning from the installation absorbs energy from the boiler’s heat transfer surfaces and is sent through the supply line to the service circuit. Circulation arrangements, target supply and return temperatures, and the system’s heat demand are assessed together.
The hot water or high-temperature hot water application is engineered for the selected temperature and pressure conditions. Expansion, pressure control and temperature limiting equipment is selected together with the installation. Water quality and adequate circulation are addressed in the operating plan to control corrosion and deposits.
To limit heat loss, hot surfaces are protected with insulation and external cladding suited to the design conditions. Insulation material, thickness and cladding details are determined by the operating temperature and order scope.
The combustion system, heat transfer surfaces and flue connections must be accessible for maintenance. Service clearances around the equipment, door opening directions and cleaning areas are considered when planning the facility layout.
A suitable burner and fuel preparation system are selected for natural gas, LNG, CNG, LPG, diesel and fuel oil. For methane and biogas, gas composition, treatment requirements and burner compatibility are assessed separately. A single burner must not be assumed to support every fuel.
Open the unit converterAll other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. This affects fuel feeding, the combustion chamber, heat transfer surfaces and, at the design stage, boiler dimensions.
At ENORPA, we design the boiler around the selected fuel and target capacity. An existing boiler cannot deliver the same thermal output with every fuel. Achievable capacity is determined by assessing fuel properties, the burner or feeding system, and boiler design together.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Within the series’ thermal output range of 510–20,000 kW, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.
A burner is selected for the order. Burner-fired construction for hot water and high-temperature hot water applications. No solid-fuel grate is fitted.
A suitable configuration is considered within this series. Target water temperature, operating pressure and installation conditions are determined for each project; a single operating temperature must not be assumed for the entire series.
You can choose the boiler body alone, supply with auxiliary equipment, or a solution covering the boiler room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.
Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.
The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.
Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.
An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.
Semi-cylindrical · Four-pass · Fire-tube
Semi-cylindrical · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.