The right decision
starts with an expert.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Water heating with different fuel options.
For solid fuel: a moving grate with water and air cooling, clinker crushing and ash discharge. Switching between fuels is possible; different fuels are not burned simultaneously.
We approach Obsidyen as an integrated boiler room solution based on your facility’s heat demand and the fuel it will use. We plan the boiler with equipment that works as a coordinated system, from fuel storage and handling to the water circuit, combustion air and flue gas discharge.
For solid-fuel operation, the ground-level hopper, conveyor belt or screw, and boiler hopper form the feeding line. Hydraulic feed rams, the moving grate and clinker crusher are assessed together with the combustion arrangement in the water-jacketed pre-furnace.
We engineer the water supply, return and expansion lines together with the fresh air fan, multicyclone, flue gas fan and chimney. For liquid or gaseous fuel, we assess burner compatibility and fuel pipework separately.
Access to maintenance doors, ash removal areas, ventilation and the location of automation controls for operator monitoring are also part of the layout design. This allows us to plan the boiler room around daily operation and maintenance needs. Final equipment selection and scope of supply are determined for each project and order.
Obsidyen is designed for hot water and high-temperature hot water applications with a semi-cylindrical, four-pass, fire-tube construction. Fuel preparation, combustion and heat transfer are engineered together according to the selected capacity and the facility’s operating conditions.
Capacity and construction | |
|---|---|
| Thermal output range | Solid fuel: 750,000–5,000,000 kcal/h Liquid/gas fuel: 1,500–10,000 kW |
| Operating pressure | 1–14 barG |
| Operating water temperature | Engineered to suit hot water or high-temperature hot water requirements |
| Construction | Semi-cylindrical · Four-pass · Fire-tube |
| Fuel | Solid / liquid / gas fuel |
| Fuel feeding / combustion | Top-fed hydraulic ram feeding or burner |
| Solid-fuel lower heating value | 2,000–7,500 kcal/kg |
| Minimum fuel particle size | Greater than 8 mm |
| Maximum fuel size | Up to 120 mm with hydraulic feeding |
| Manufacturing | Engineered to order |
| Product family | Hot Water & High-Temperature Hot Water Boilers |
Material standards | |
| Boiler steels In high-pressure sections: | EN 10028-2 grade P355GH, P295GH, P265GH and P235GH |
| Steel grades In non-pressurized or low-pressure sections: | EN 10025-2 grade S355JR, S235JR |
| Fire and smoke tubes | EN 10217-2 or EN 10216-2 grade P235GH |
The series is engineered to order within thermal output ranges of 750,000–5,000,000 kcal/h for solid fuel and 1,500–10,000 kW for liquid/gas fuel, and an operating pressure range of 1–14 barG. These are the series limits of units that can be manufactured at different capacities; they do not represent the load adjustment range of a single unit. Final capacity, operating conditions and equipment scope are determined for each project.
Solid fuel is delivered to the boiler hopper from a storage area suited to the facility layout. If the system includes a ground-level hopper, a transfer screw or conveyor belt moves fuel between these two points. Fuel loaded into the hopper from above moves towards the feed opening.
Fuel moisture, ash content, size and flow characteristics are considered when selecting the transfer line. The ground-level hopper, agitator, level sensor and conveying equipment are determined by the order scope.
The hydraulic ram pushes fuel from the hopper outlet onto the inlet of the grate. Fixed and moving grate elements work together to advance the fuel bed gradually. Combustion air is distributed beneath the grate and passes into the fuel bed.
In the first zone, fuel heats up and loses moisture; ignition and intensive combustion occur in the following zones. Combustion is completed towards the end of the grate, and residues begin to cool. The water- and air-cooled moving grate forms part of this fuel movement and combustion arrangement.
Ash and clinker produced after combustion are transferred from the end of the grate to the crusher. The crusher reduces large residues; crushed clinker and ash pass through the discharge line to the collection section. In the animated arrangement, this section is an ash trolley.
Ash quantity and clinker formation depend on the fuel properties. Access areas required for collection, emptying and maintenance are planned together with the boiler room layout.
In the burner-fired option, liquid or gaseous fuel is delivered to the burner through a preparation and supply line suited to that fuel. The burner fan supplies combustion air; ignition, flame supervision and fuel–air adjustment are handled by the selected burner’s control system.
Switching between solid-fuel and burner-fired operation is possible; different fuels are not burned simultaneously. Switching must not be assumed to be automatic or uninterrupted. Burner compatibility, connections and switching conditions are defined within the project.
Hot gases produced in the combustion chamber travel through the four-pass fire-tube arrangement. Reversal sections direct the gases into the next pass, allowing them to contact the heat transfer surfaces before reaching the outlet.
Energy from the hot gases is transferred to the boiler water surrounding the fire and smoke tubes and combustion surfaces. Cleaning the flue gas passages, checking deposits on heat transfer surfaces and providing maintenance access form part of the operating plan.
A multicyclone is available as an option for the flue gas line in solid-fuel operation. It separates some of the solid particles carried by the gas and collects them in a hopper. Equipment scope is determined for each project. Flue and duct dimensions, gas flow rate and the system’s pressure losses are assessed together.
Where a flue gas fan is required, it is selected according to the total resistance of the boiler and auxiliary equipment. The layout of the fan, dampers and cleaning doors is determined for each project; auxiliary equipment must not automatically be assumed to be included in the standard delivery.
Water returning from the installation absorbs energy from the boiler’s heat transfer surfaces and is sent through the supply line to the service circuit. Circulation arrangements, target supply and return temperatures, and the system’s heat demand are assessed together.
The hot water or high-temperature hot water application is engineered for the selected temperature and pressure conditions. Expansion, pressure control and temperature limiting equipment is selected together with the installation. Water quality and adequate circulation are addressed in the operating plan to control corrosion and deposits.
To limit heat loss, hot surfaces are protected with insulation and external cladding suited to the design conditions. Insulation material, thickness and cladding details are determined by the operating temperature and order scope.
The combustion system, heat transfer surfaces and flue connections must be accessible for maintenance. Service clearances around the equipment, door opening directions and cleaning areas are considered when planning the facility layout.
Coal and lignite; wood, pellets and appropriately sized wood chips; olive pomace and agricultural biomass may be considered when the fuel conditions are met. Fuels containing plastic or unsuitable chemical additives are not accepted. A fuel name alone does not establish suitability; lower heating value, size, composition, moisture content and analysis requirements are assessed together.
A suitable burner and fuel preparation system are selected for natural gas, LNG, CNG, LPG, diesel and fuel oil. For methane and biogas, gas composition, treatment requirements and burner compatibility are assessed separately. A single burner must not be assumed to support every fuel.
Switching between solid fuel and liquid/gas fuel is possible; different fuels are not burned simultaneously. Switching must not be assumed to be automatic or uninterrupted.
Open the unit converterThe product’s current range for project assessment is 2,000–7,500 kcal/kg; this is separate from the typical values in the IEA table. Fuel size must be greater than 8 mm. With hydraulic feeding, the maximum is 120 mm.
LIQUID / GASEOUS FUELS · IEA · LOWER HEATING VALUE41.57–50.03 MJ/kgAll other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. This affects fuel feeding, the combustion chamber, heat transfer surfaces and, at the design stage, boiler dimensions.
At ENORPA, we design the boiler around the selected fuel and target capacity. An existing boiler cannot deliver the same thermal output with every fuel. Achievable capacity is determined by assessing fuel properties, the burner or feeding system, and boiler design together.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Within the series’ thermal output ranges of 750,000–5,000,000 kcal/h for solid fuel and 1,500–10,000 kW for liquid/gas fuel, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.
Top-fed hydraulic ram feeding or burner. For solid fuel: a moving grate with water and air cooling, clinker crushing and ash discharge. Switching between fuels is possible; different fuels are not burned simultaneously.
No. Switching between solid fuel and liquid/gas fuel is possible, but they are not burned simultaneously. Output ranges differ by fuel and are stated separately in the technical table.
A suitable configuration is considered within this series. Target water temperature, operating pressure and installation conditions are determined for each project; a single operating temperature must not be assumed for the entire series.
You can choose the boiler body alone, supply with auxiliary equipment, or a solution covering the boiler room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.
Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.
The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.
Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.
An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Semi-cylindrical · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.