A solid-fuel water boiler with a moving grate.
Moving grate with water and air cooling; clinker crushing and ash discharge system.
For Ametist, we assess your facility’s hot water or high-temperature hot water requirements, target supply and return temperatures, and operating pressure together. We plan the boiler with equipment that works as a coordinated system, from fuel feeding and water circulation to combustion air and the flue connection.
For solid-fuel operation, we treat the ground-level hopper, transfer screw or conveyor belt, and boiler hopper as one feeding line. We plan the layout of the hydraulic forward-feed ram, water- and air-cooled moving grate, clinker crusher and ash collection section together. Compatibility between combustion air, the optional multicyclone, the flue gas fan and the flue system is assessed within the project.
We engineer the water supply, return and expansion lines together with circulation, temperature control and pressure safety equipment. We determine hot water or high-temperature hot water operating conditions to suit the installation’s requirements, treating water quality, adequate circulation and maintenance access as part of the design.
The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. For solid-fuel operation, we also arrange fuel loading and ash removal areas for practical daily use. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.
Ametist is designed for hot water and high-temperature hot water applications with a semi-cylindrical, three-pass, fire-tube construction. Fuel preparation, combustion and heat transfer are engineered together according to the selected capacity and the facility’s operating conditions.
Capacity and construction | |
|---|---|
| Thermal output range | 2,000,000–5,000,000 kcal/h |
| Operating pressure | 1–6 barG |
| Operating water temperature | Engineered to suit hot water or high-temperature hot water requirements |
| Construction | Semi-cylindrical · Three-pass · Fire-tube |
| Fuel | Solid fuel |
| Fuel feeding / combustion | Top-fed hydraulic ram feeding |
| Solid-fuel lower heating value | 2,000–7,500 kcal/kg |
| Minimum fuel particle size | Greater than 8 mm |
| Maximum fuel size | Up to 120 mm with hydraulic feeding |
| Manufacturing | Engineered to order |
| Product family | Hot Water & High-Temperature Hot Water Boilers |
Material standards | |
| Boiler steels In high-pressure sections: | EN 10028-2 grade P355GH, P295GH, P265GH and P235GH |
| Steel grades In non-pressurized or low-pressure sections: | EN 10025-2 grade S355JR, S235JR |
| Fire and smoke tubes | EN 10217-2 or EN 10216-2 grade P235GH |
The series is engineered to order within a thermal output range of 2,000,000–5,000,000 kcal/h and an operating pressure range of 1–6 barG. These are the series limits of units that can be manufactured at different capacities; they do not represent the load adjustment range of a single unit. Final capacity, operating conditions and equipment scope are determined for each project.
Solid fuel is delivered to the boiler hopper from a storage area suited to the facility layout. If the system includes a ground-level hopper, a transfer screw or conveyor belt moves fuel between these two points. Fuel loaded into the hopper from above moves towards the feed opening.
Fuel moisture, ash content, size and flow characteristics are considered when selecting the transfer line. The ground-level hopper, agitator, level sensor and conveying equipment are determined by the order scope.
The hydraulic ram pushes fuel from the hopper outlet onto the inlet of the grate. Fixed and moving grate elements work together to advance the fuel bed gradually. Combustion air is distributed beneath the grate and passes into the fuel bed.
In the first zone, fuel heats up and loses moisture; ignition and intensive combustion occur in the following zones. Combustion is completed towards the end of the grate, and residues begin to cool. The water- and air-cooled moving grate forms part of this fuel movement and combustion arrangement.
Ash and clinker produced after combustion are transferred from the end of the grate to the crusher. The crusher reduces large residues; crushed clinker and ash pass through the discharge line to the collection section. In the animated arrangement, this section is an ash trolley.
Ash quantity and clinker formation depend on the fuel properties. Access areas required for collection, emptying and maintenance are planned together with the boiler room layout.
Hot gases produced in the combustion chamber travel through the three-pass fire-tube arrangement. Reversal sections direct the gases into the next pass, allowing them to contact the heat transfer surfaces before reaching the outlet.
Energy from the hot gases is transferred to the boiler water surrounding the fire and smoke tubes and combustion surfaces. Cleaning the flue gas passages, checking deposits on heat transfer surfaces and providing maintenance access form part of the operating plan.
A multicyclone is available as an option for the flue gas line in solid-fuel operation. It separates some of the solid particles carried by the gas and collects them in a hopper. Equipment scope is determined for each project. Flue and duct dimensions, gas flow rate and the system’s pressure losses are assessed together.
Where a flue gas fan is required, it is selected according to the total resistance of the boiler and auxiliary equipment. The layout of the fan, dampers and cleaning doors is determined for each project; auxiliary equipment must not automatically be assumed to be included in the standard delivery.
Water returning from the installation absorbs energy from the boiler’s heat transfer surfaces and is sent through the supply line to the service circuit. Circulation arrangements, target supply and return temperatures, and the system’s heat demand are assessed together.
The hot water or high-temperature hot water application is engineered for the selected temperature and pressure conditions. Expansion, pressure control and temperature limiting equipment is selected together with the installation. Water quality and adequate circulation are addressed in the operating plan to control corrosion and deposits.
To limit heat loss, hot surfaces are protected with insulation and external cladding suited to the design conditions. Insulation material, thickness and cladding details are determined by the operating temperature and order scope.
The combustion system, heat transfer surfaces and flue connections must be accessible for maintenance. Service clearances around the equipment, door opening directions and cleaning areas are considered when planning the facility layout.
Coal and lignite; wood, pellets and appropriately sized wood chips; olive pomace and agricultural biomass may be considered when the fuel conditions are met. Fuels containing plastic or unsuitable chemical additives are not accepted. A fuel name alone does not establish suitability; lower heating value, size, composition, moisture content and analysis requirements are assessed together.
Open the unit converterThe product’s current range for project assessment is 2,000–7,500 kcal/kg; this is separate from the typical values in the IEA table. Fuel size must be greater than 8 mm. With hydraulic feeding, the maximum is 120 mm.
All other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. Fuel moisture and ash content also affect combustion. The feeding system, combustion chamber, grate, heat transfer surfaces and boiler dimensions are therefore determined by the selected fuel.
At ENORPA, we design the boiler around the selected fuel and target capacity. A boiler cannot deliver the same thermal output with every solid fuel; achievable capacity is assessed together with the fuel analysis and feeding system.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Within the series’ thermal output range of 2,000,000–5,000,000 kcal/h, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.
Top-fed hydraulic ram feeding. Moving grate with water and air cooling; clinker crushing and ash discharge system.
A suitable configuration is considered within this series. Target water temperature, operating pressure and installation conditions are determined for each project; a single operating temperature must not be assumed for the entire series.
You can choose the boiler body alone, supply with auxiliary equipment, or a solution covering the boiler room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.
Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.
The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.
Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.
An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Semi-cylindrical · Four-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.