The right decision
starts with an expert.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
A twin-furnace solid-fuel solution for water heating.
Twin-furnace construction with an air-cooled fixed grate. The same capacity range applies to manual-feed and stoker-fed versions.
For Kalsedon, we assess your facility’s hot water or high-temperature hot water requirements, target supply and return temperatures, and operating pressure together. We plan the boiler with equipment that works as a coordinated system, from fuel feeding and water circulation to combustion air and the flue connection.
For the twin-furnace construction, we select manual loading or an underfeed stoker to suit the fuel and operating arrangements. For stoker operation, we plan the boiler hopper, feed screw and combustion air together; for manual operation, we plan access for loading and ash removal. Additional equipment such as a ground-level hopper and conveyor is included in the feeding line only where specified in the project scope.
We engineer the water supply, return and expansion lines together with circulation, temperature control and pressure safety equipment. We determine hot water or high-temperature hot water operating conditions to suit the installation’s requirements, treating water quality, adequate circulation and maintenance access as part of the design.
The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. For solid-fuel operation, we also arrange fuel loading and ash removal areas for practical daily use. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.
Within its fully cylindrical shell, Kalsedon transfers heat from fuel combustion to water through a three-pass fire-tube arrangement. Operating conditions are engineered to meet the facility’s hot water or high-temperature hot water requirements. The sequence below describes the stoker-fed option; with manual feeding, the operator loads fuel onto the fixed grate.
Capacity and construction | |
|---|---|
| Thermal output range | 1,500,000–3,500,000 kcal/h |
| Operating pressure | 1–16 barG |
| Operating water temperature | Engineered to suit hot water or high-temperature hot water requirements |
| Construction | Fully cylindrical · Scotch type · Three-pass · Fire-tube |
| Fuel | Solid fuel |
| Fuel feeding / combustion | Manual feeding or underfeed stoker |
| Solid-fuel lower heating value | 2,000–7,500 kcal/kg |
| Minimum fuel particle size | Greater than 8 mm |
| Maximum fuel size | Up to 500 mm with manual feeding; up to 35 mm with stoker feeding |
| Manufacturing | Engineered to order |
| Product family | Hot Water & High-Temperature Hot Water Boilers |
Material standards | |
| Boiler steels In high-pressure sections: | EN 10028-2 grade P355GH, P295GH, P265GH and P235GH |
| Steel grades In non-pressurized or low-pressure sections: | EN 10025-2 grade S355JR, S235JR |
| Fire and smoke tubes | EN 10217-2 or EN 10216-2 grade P235GH |
The series is engineered to order within a thermal output range of 1,500,000–3,500,000 kcal/h and an operating pressure range of 1–16 barG. These are the series limits of boilers that can be manufactured at different capacities; they do not represent the load adjustment range of a single boiler. Final capacity, operating temperature, pressure and equipment scope are determined for each project.
In a stoker-fed system, the fuel path starts at the boiler hopper. If the system also includes a ground-level hopper, the user loads fuel there; a transfer screw or conveyor moves it to the boiler hopper. If a level sensor is specified in the order, the transfer system starts automatically when the fuel level in the hopper falls.
The grid screen at the hopper inlet helps suitably sized fuel pass through. Sloping hopper walls help fuel flow towards the feeding point. Depending on the fuel type and flow properties, an agitator may be used in the ground-level or boiler hopper. Equipment such as the ground-level hopper, conveyor, sensor and agitator is determined by the order scope.
Fuel descending from the hopper into the screw channel is conveyed to the burn pot by the feed screw driven by the geared motor. Fuel rises through the pot to reach the combustion bed. Air from the fresh air fan travels through a separate air duct surrounding the screw tube and is distributed to the air openings in the pot. Heated along this path, the air meets the fuel in the combustion bed.
Initial ignition is performed by the operator; combustion is then maintained by fuel and air feeding. The extent and depth of the combustion bed are monitored during operation. An excessively thin bed may expose the feeding system to high temperatures.
Ash forms after combustion; depending on the fuel properties, some ash may fuse into clinker. Ash and clinker are removed after cooling on the cooling grate at the front. Inspection doors at the hopper-to-screw connection provide access to the fuel flow; maintenance doors around the fan and in front of the pot make it easier to inspect air passages and remove accumulated ash.
In the first pass, hot combustion gases travel along the furnace. They then reach the rear reversal chamber and are directed into the second-pass smoke tubes. The water-surrounded wet-back construction of this chamber contributes to the transfer of heat from the hot gases to the boiler water.
Gases from the second-pass tubes enter the front smoke box, change direction and pass into the third-pass tubes. At the end of the third pass, they reach the rear smoke box and then the flue connection duct. The water-surrounded surfaces of the front and rear smoke boxes contribute to heat transfer; refractory lining on the outward-opening maintenance doors limits heat loss through these surfaces.
The route after the flue connection is arranged according to the boiler room design. Gases are directed either straight to the flue system or through a single cyclone or multicyclone where included. The cyclone separates some of the solid particles carried by the gas and collects them in a hopper.
The flue gas fan draws gases through the boiler and, where fitted, the cyclone, and sends them to the chimney. Dampers in the ducts allow flow adjustment, while cyclone doors provide access for cleaning and maintenance. The gases are finally discharged to the atmosphere through the chimney.
Energy from hot gases in the furnace and smoke tubes is transferred to the boiler water surrounding these surfaces. Heated water is sent through the supply line to the installation to meet heating or process requirements. Operating temperature and pressure are determined together according to the hot water or high-temperature hot water requirement. In high-temperature hot water applications, system pressure is set so that water remains liquid at the target temperature.
After transferring its heat to the installation, water returns to the boiler through the return line, is reheated and re-enters circulation. Water guide channels inside the boiler limit direct impingement of cooler return water on the third-pass tubes and help direct it towards warmer areas. This arrangement is intended to reduce the risk of flue gas condensation on cold surfaces and the resulting corrosion.
The boiler shell is insulated with glass wool or stone wool according to the design conditions. Durable external cladding over the insulation is arranged to protect it from crushing and external influences. This limits heat released through the shell to the surroundings and helps retain the generated energy inside the boiler.
Coal and lignite; wood, pellets and appropriately sized wood chips; olive pomace and agricultural biomass may be considered when the fuel conditions are met. Fuels containing plastic or unsuitable chemical additives are not accepted. A fuel name alone does not establish suitability; lower heating value, size, composition, moisture content and analysis requirements are assessed together.
Open the unit converterThe product’s current range for project assessment is 2,000–7,500 kcal/kg; this is separate from the typical values in the IEA table. Fuel size must be greater than 8 mm. The maximum is 500 mm with manual feeding and 35 mm with stoker feeding.
All other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. Fuel moisture and ash content also affect combustion. The feeding system, combustion chamber, grate, heat transfer surfaces and boiler dimensions are therefore determined by the selected fuel.
At ENORPA, we design the boiler around the selected fuel and target capacity. A boiler cannot deliver the same thermal output with every solid fuel; achievable capacity is assessed together with the fuel analysis and feeding system.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Within the series’ thermal output range of 1,500,000–3,500,000 kcal/h, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.
Manual feeding or underfeed stoker. Twin-furnace construction with an air-cooled fixed grate. The same capacity range applies to manual-feed and stoker-fed versions.
No. The thermal output range is 1,500,000–3,500,000 kcal/h for both feeding options. The choice depends on fuel size and operating arrangements.
A suitable configuration is considered within this series. Target water temperature, operating pressure and installation conditions are determined for each project; a single operating temperature must not be assumed for the entire series.
You can choose the boiler body alone, supply with auxiliary equipment, or a solution covering the boiler room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.
Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.
The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.
Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.
An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Semi-cylindrical · Four-pass · Fire-tube
Semi-cylindrical · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.