Steam generation from solid fuel with a moving grate.
Moving grate with water and air cooling; clinker crushing and ash discharge system.
For Ametrin, we assess your process steam requirements, operating pressure and daily load variations together. We design the boiler as part of a coordinated boiler room, integrating fuel preparation, combustion air, feedwater, steam distribution and the flue system.
For solid-fuel operation, we treat the ground-level hopper, transfer screw or conveyor belt, and boiler hopper as a complete feeding line. We plan the arrangement of the hydraulic forward-pushing ram, moving grate with water and air cooling, clinker crusher and ash collection section together. Combustion air, the multicyclone option, the flue gas fan and the flue system are assessed together as part of the project.
We engineer feedwater treatment, pumping, steam discharge, condensate return and the necessary drain and blowdown lines together with the process installation. We ensure that water level and pressure control equipment is compatible with the boiler and feedwater system. Water quality, scale prevention and corrosion control form part of the operating plan.
The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. For solid-fuel operation, we also arrange fuel loading and ash removal areas to suit daily use. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.
Ametrin is designed for steam generation with a semi-cylindrical, three-pass, fire-tube construction. Fuel preparation, combustion and heat transfer are engineered together around the selected capacity and the facility’s operating conditions.
Capacity and construction | |
|---|---|
| Steam output range | 2,000–5,000 kg/h |
| Operating pressure | 1–6 barG |
| Construction | Semi-cylindrical · Three-pass · Fire-tube |
| Fuel | Solid fuel |
| Fuel feeding / combustion | Top-fed hydraulic ram feeding |
| Solid-fuel lower heating value | 2,000–7,500 kcal/kg |
| Minimum fuel particle size | Above 8 mm |
| Maximum fuel size | Up to 120 mm with hydraulic feeding |
| Manufacturing | Engineered to order |
| Product family | Steam Boilers & Generators |
Material standards | |
| Boiler steels In high-pressure sections: | EN 10028-2 grade P355GH, P295GH, P265GH and P235GH |
| Steel grades In non-pressurized or low-pressure sections: | EN 10025-2 grade S355JR, S235JR |
| Fire and smoke tubes | EN 10217-2 or EN 10216-2 grade P235GH |
The series is engineered to order within a steam output range of 2,000–5,000 kg/h and an operating pressure range of 1–6 barG. These are the series limits for units manufactured at different capacities, not the load adjustment range of a single unit. Final capacity, operating conditions and equipment scope are determined for each project.
Solid fuel is delivered to the boiler hopper from a storage area suited to the site layout. If the system includes a ground-level hopper, a screw conveyor or conveyor belt transfers fuel between these two points. Fuel loaded into the hopper from above moves towards the feeder inlet.
Fuel moisture, ash content, size and flow properties are considered when selecting the transfer line. The ground-level hopper, agitator, level sensor and conveying equipment are specified according to the order scope.
The hydraulic ram pushes fuel from the hopper outlet onto the start of the grate. Fixed and moving grate elements work together to advance the fuel bed gradually. Combustion air is distributed beneath the grate and supplied to the fuel bed.
Fuel heats up and loses moisture in the first zone; ignition and intensive combustion take place in the subsequent zones. Towards the end of the grate, combustion is completed and the residues begin to cool. The moving grate with water and air cooling forms part of this fuel movement and combustion arrangement.
Ash and clinker formed during combustion are transferred from the end of the grate to the crusher. The crusher reduces large residues; crushed clinker and ash are carried through the discharge line to the collection section. In the animated arrangement, this section is an ash trolley.
Ash quantity and clinker formation depend on fuel properties. Access areas required for collection, emptying and maintenance are planned together with the boiler room layout.
Hot gases from the combustion chamber travel through the three-pass fire-tube construction. Reversal sections direct the gases into the next pass, allowing them to contact the heat transfer surfaces before reaching the outlet.
Energy from the hot gases is transferred to the boiler water surrounding the fire and smoke tubes and combustion surfaces. Cleaning the flue gas passages, checking deposits on heat transfer surfaces and providing maintenance access form part of the operating plan.
For solid-fuel operation, a multicyclone is available as an option for the flue gas line. It separates some of the solid particles carried by the gas and collects them in a hopper. Equipment scope is determined for each project. Flue and duct dimensions, gas flow rate and system pressure losses are assessed together.
Where a flue gas fan is required, it is selected for the combined resistance of the boiler and auxiliary equipment. Fan, damper and cleaning access arrangements are determined for each project; auxiliary equipment must not automatically be assumed to be included in standard delivery.
Water surrounding the heat transfer surfaces turns into steam when it reaches the boiling temperature corresponding to the operating pressure. The steam is supplied to the process line, and the feedwater system replenishes the water used. Pressure and feedwater control and safety equipment are arranged according to the selected design.
Feedwater quality is important for controlling scale formation and corrosion on heat transfer surfaces. Water treatment, condensate return and the necessary drain and blowdown arrangements are engineered around site conditions. Operation and maintenance must follow the product’s instructions.
To limit heat loss, hot surfaces are protected with insulation and external cladding suited to the design conditions. Insulation material, thickness and cladding details are determined by operating temperature and order scope.
Maintenance access must be provided to the combustion system, heat transfer surfaces and flue connections. Service clearances around equipment, door opening directions and cleaning areas are considered when preparing the facility layout.
Coal and lignite; wood, pellets and suitably sized wood chips; olive pomace and agricultural biomass may be considered when fuel requirements are met. Fuels containing plastic or unsuitable chemical additives are not accepted. A fuel’s name alone does not establish suitability; lower heating value, size, composition, moisture content and analysis requirements are assessed together.
Open the unit converterThe product’s current project assessment range is 2,000–7,500 kcal/kg; this is separate from the typical values in the IEA table. Required fuel size: Above 8 mm . With hydraulic feeding, the maximum is 120 mm.
All other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. Fuel moisture and ash content also affect combustion. The feeding system, combustion chamber, grate, heat transfer surfaces and boiler dimensions are therefore determined for the selected fuel.
At ENORPA, we design the boiler around the selected fuel and target capacity. A boiler cannot deliver the same thermal output with every solid fuel; achievable capacity is assessed together with the fuel analysis and feeding system.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Within the series’ steam output range of 2,000–5,000 kg/h, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.
Top-fed hydraulic ram feeding. Moving grate with water and air cooling; clinker crushing and ash discharge system.
You can choose the boiler body alone, supply with auxiliary equipment, or a solution covering the boiler room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.
Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.
The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.
Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.
An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Semi-cylindrical · Four-pass · Fire-tube
Coiled-tube · Water-tube steam generator
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.