The right decision
starts with an expert.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Steam generation with a coiled water-tube construction.
The coiled water-tube construction operates with a burner for liquid and gaseous fuels.
For Jasper, we assess your process steam requirements, operating pressure and daily load variations together. We design the coiled water-tube generator as part of a coordinated boiler room, integrating fuel preparation, combustion air, feedwater, steam distribution and the flue system.
We select the burner, fuel preparation equipment and supply pipework to suit the properties of the liquid or gaseous fuel. The design accounts for the burner’s air requirements, boiler room ventilation and flue operating conditions. Fuel types and any backup fuel arrangements depend on the selected burner and system equipment.
We engineer feedwater treatment, pumping, steam discharge, condensate return and the necessary drain and blowdown lines together with the process installation. We assess the water supply arrangement suited to Jasper’s coiled-tube construction together with burner control. Water quality, scale prevention and corrosion control form part of the operating plan.
The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.
Jasper is designed for steam generation with a coiled water-tube steam generator construction. Fuel preparation, combustion and heat transfer are engineered together around the selected capacity and the facility’s operating conditions.
Capacity and construction | |
|---|---|
| Steam output range | 500–3,000 kg/h |
| Operating pressure | 1–16 barG |
| Construction | Coiled-tube · Water-tube steam generator |
| Fuel | Liquid / gas fuel |
| Fuel feeding / combustion | Burner selected for the order |
| Manufacturing | Engineered to order |
| Product family | Steam Boilers & Generators |
Material standards | |
| Boiler steels In high-pressure sections: | EN 10028-2 grade P355GH, P295GH, P265GH and P235GH |
| Steel grades In non-pressurized or low-pressure sections: | EN 10025-2 grade S355JR, S235JR |
The series is engineered to order within a steam output range of 500–3,000 kg/h and an operating pressure range of 1–16 barG. These are the series limits for units manufactured at different capacities, not the load adjustment range of a single unit. Final capacity, operating conditions and equipment scope are determined for each project.
Liquid or gaseous fuel reaches the burner through a supply line suited to the selected fuel. Gas supply pressure and flow conditions, and liquid fuel storage and flow properties, are assessed alongside burner selection. The scope of filtration, regulation and any necessary fuel preparation equipment is specified in the project.
Compatibility between the burner and fuel type is essential. Different liquid and gaseous fuels may require different equipment, so a single burner must not be assumed to operate with every fuel.
The burner fan supplies the air required for combustion. At startup, safety conditions are checked and the combustion chamber is pre-purged. During ignition, gaseous fuel is supplied to the combustion head, while liquid fuel is atomized and mixed with air.
Combustion is monitored by the flame supervision system. Fuel and air quantities are adjusted according to the selected burner’s control method and heat demand. During shutdown, fuel supply is cut off and post-purge is completed according to the burner’s control sequence.
In Jasper, water flows through tubes arranged in a coil. Hot combustion gases from the burner heat the outer tube surfaces, and heat passes through the tube walls to the water. The water heats up inside the tubes as part of the steam generation process.
The coiled tube arrangement provides the heat transfer area exposed to the hot gases. Water flow inside the tubes and thermal loading on the outer surfaces are assessed together. Surface cleanliness and water quality are important for maintaining heat transfer.
After the heat transfer section, combustion gases flow towards the flue connection. Flue and duct dimensions, gas flow rate and system pressure losses are assessed together.
The feedwater pump delivers water to the coiled tube circuit. Steam generation is managed by controlling water flow and burner thermal output together. Pressure and feedwater control and safety equipment are arranged according to the selected design.
Feedwater quality is important for controlling scale formation and corrosion on heat transfer surfaces. Water treatment, condensate return and the necessary drain and blowdown arrangements are engineered around site conditions. Operation and maintenance must follow the product’s instructions.
To limit heat loss, hot surfaces are protected with insulation and external cladding suited to the design conditions. Insulation material, thickness and cladding details are determined by operating temperature and order scope.
Maintenance access must be provided to the combustion system, heat transfer surfaces and flue connections. Service clearances around equipment, door opening directions and cleaning areas are considered when preparing the facility layout.
A suitable burner and preparation system are selected for natural gas, LNG, CNG, LPG, diesel and fuel oil. For methane and biogas, gas composition, treatment requirements and burner compatibility are assessed separately. A single burner must not be assumed to support every fuel.
Open the unit converterAll other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. This affects fuel feeding, the combustion chamber, heat transfer surfaces and, at the design stage, boiler dimensions.
At ENORPA, we design the boiler around the selected fuel and target capacity. An existing boiler cannot deliver the same thermal output with every fuel. Achievable capacity is determined by assessing fuel properties, the burner or feeding system, and boiler design together.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Within the series’ steam output range of 500–3,000 kg/h, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.
A burner is selected for the order. The coiled water-tube construction operates with a burner for liquid and gaseous fuels.
Jasper is a coiled water-tube steam generator. Its construction differs from Scotch-type fire-tube series such as Kuvars. Selection is based on a combined assessment of your steam requirements and site conditions.
You can choose the boiler body alone, supply with auxiliary equipment, or a solution covering the boiler room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.
Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.
The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.
Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.
An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Semi-cylindrical · Four-pass · Fire-tube
Semi-cylindrical · Three-pass · Fire-tube
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.