The right decision
starts with an expert.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Steam power designed
around your process requirements.
Fully cylindrical, three-pass design. Manual or stoker fuel feeding. Engineered to order around your capacity and operating conditions.
For Kuvars Tek Külhanlı, we assess your process steam requirements, operating pressure and daily load variations together. We design the boiler as part of a coordinated boiler room, integrating fuel preparation, combustion air, feedwater, steam distribution and the flue system.
For the single-furnace construction, we select manual loading or underfeed stoker feeding to suit the fuel and operating arrangements. For the stoker-fed version, we plan the boiler hopper, feed screw and combustion air together; for the manual version, we plan loading and ash removal access. Additional equipment such as a ground-level hopper and conveyor is included in the feeding line only when it forms part of the project scope.
We engineer feedwater treatment, pumping, steam discharge, condensate return and the necessary drain and blowdown lines together with the process installation. We ensure that water level and pressure control equipment is compatible with the boiler and feedwater system. Water quality, scale prevention and corrosion control form part of the operating plan.
The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. For solid-fuel operation, we also arrange fuel loading and ash removal areas to suit daily use. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.
Both options offer a steam output range of 300–3,000 kg/h
across the series.
Small-capacity boilers do not have a screw conveyor transferring coal from the coal pit to the boiler hopper. This animation explains the system’s general operating principle. Equipment may vary according to the order scope.
This animation explains the system’s general operating principle. Equipment may vary according to the order scope.
Within its fully cylindrical body, Kuvars Tek Külhanlı transfers heat from fuel combustion to water through a three-pass fire-tube construction. The sequence below describes the stoker feeding option; with manual feeding, the operator loads fuel onto the fixed grate.
Capacity and construction | |
|---|---|
| Steam output | 300–3,000 kg/h |
| Operating pressure | 1–16 barG |
| Body and installation | Fully cylindrical · Scotch type · Floor-standing |
| Tube arrangement | Fire-tube |
| Number of flue gas passes | 3 |
| Number of furnaces | 1 |
| Grate | Air-cooled, fixed |
| Fuel feeding | Manual / Underfeed stoker |
| Manufacturing | Engineered to order |
| Product type | Solid-fuel steam boiler |
Material standards | |
| Boiler steels In high-pressure sections: | EN 10028-2 grade P355GH, P295GH, P265GH and P235GH |
| Steel grades In non-pressurized or low-pressure sections: | EN 10025-2 grade S355JR, S235JR |
| Fire and smoke tubes | EN 10217-2 or EN 10216-2 grade P235GH |
The series is engineered to order within a steam output range of 300–3,000 kg/h and an operating pressure range of 1–16 barG. These are the series limits for boilers manufactured at different capacities, not the load adjustment range of a single boiler. Final capacity, pressure and equipment scope are determined for each project.
In the stoker-fed arrangement, the fuel’s journey starts at the boiler hopper. If the system also has a ground-level hopper, the operator loads fuel there, and a screw conveyor or conveyor transfers it to the boiler hopper. If a level sensor is selected in the order, the transfer system starts automatically when the fuel level in the hopper falls.
The grate screen at the hopper inlet helps suitably sized fuel pass through. Sloping hopper surfaces help fuel flow towards the feeding point. An agitator may be used in the ground-level or boiler hopper, depending on fuel type and flow properties. Equipment such as the ground-level hopper, conveyor, sensor and agitator is specified according to the order scope.
Fuel drops from the hopper into the screw channel and travels to the burn pot on the feed screw driven by the gearbox. Fuel rises from inside the burn pot to reach the combustion bed. Air from the fresh air fan passes through a separate air passage surrounding the screw tube and is distributed to the burn pot’s air holes. Air warmed along this route meets the fuel in the combustion bed.
The operator performs initial ignition; fuel and air supply then maintain combustion. The spread and depth of the combustion bed are monitored during operation. An excessively thin bed can expose the feeding system to high temperatures.
Combustion produces ash; depending on fuel properties, some ash may fuse into clinker. Ash and clinker are removed after cooling on the front cooling grate. Inspection covers at the hopper–screw connection provide access to the fuel flow; maintenance covers around the fan and in front of the burn pot facilitate air passage checks and the removal of accumulated ash.
In the first pass, hot combustion gases travel along the furnace. They then reach the rear reversal chamber and are directed into the second-pass smoke tubes. The water-surrounded wet-back construction of this chamber helps transfer heat from the hot gases to the boiler water.
Gases from the second-pass tubes enter the front smoke box, change direction and enter the third-pass tubes. At the end of the third pass, they reach the rear smoke box and then the flue connection duct. Water-surrounded surfaces of the front and rear smoke boxes contribute to heat transfer; refractory lining on the outward-opening maintenance doors limits heat loss through those surfaces.
The route after the flue connection is arranged according to the boiler room design. Gases flow directly to the chimney line or, if included in the system, to a single cyclone or multicyclone. The cyclone separates some of the solid particles carried by the gas and collects them in a hopper.
The flue gas fan draws gases through the boiler and any cyclone and delivers them to the chimney. Dampers in the ducts allow flow adjustment, while cyclone access covers provide access for cleaning and maintenance. Gases are finally discharged into the atmosphere through the chimney.
Energy from hot gases in the furnace and smoke tubes is transferred to the surrounding boiler water. As the water reaches the boiling temperature corresponding to the operating pressure, it turns into steam, which is used to meet process demand.
Water consumed during steam generation is replenished with feedwater. Internal water-guiding channels limit direct contact between cooler feedwater and the third-pass tubes, helping direct it towards hotter areas. This arrangement is intended to reduce flue gas condensation on cold surfaces and the associated corrosion risk.
The boiler body is insulated with glass wool or stone wool according to the design conditions. Durable external cladding over the insulation protects it from compression and external effects. This limits heat loss from the body to the surroundings and helps retain the generated energy within the boiler.
Coal and lignite; wood, pellets and suitably sized wood chips; olive pomace and agricultural biomass may be considered when fuel requirements are met. Fuels containing plastic or unsuitable chemical additives are not accepted. A fuel’s name alone does not establish suitability; lower heating value, size, composition, moisture content and analysis requirements are assessed together.
Open the unit converterThe product’s current project assessment range is 2,000–7,500 kcal/kg; this is separate from the typical values in the IEA table. Required fuel size: Above 8 mm . The maximum is 500 mm for manual feeding and 35 mm for stoker feeding.
All other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. Fuel moisture and ash content also affect combustion. The feeding system, combustion chamber, grate, heat transfer surfaces and boiler dimensions are therefore determined for the selected fuel.
At ENORPA, we design the boiler around the selected fuel and target capacity. A boiler cannot deliver the same thermal output with every solid fuel; achievable capacity is assessed together with the fuel analysis and feeding system.
Explore the heating values of different fuelsWe identify your needs together
and support you at every stage.
Comprehensive support in four stages.
One engineering approach.
Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.
Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.
We install and commission the products you purchase from us, then train your personnel in their use and operation.
When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.
Kuvars Tek Külhanlı is engineered to order within an output range of 300–3,000 kg/h. The requested combination of capacity and pressure is finalized through an engineering assessment.
Both options have the same output range. Fuel size limits and the stated general efficiency ranges differ. Manual fuel loading does not mean that boiler control is also manual.
An economizer is optional; suitability is assessed according to project and fuel conditions. Auxiliary equipment is not automatically included in every sale. No claim is made that a condenser is suitable for the solid-fuel Kuvars Tek application.
ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The period starts on the actual commissioning date accepted by ENORPA, but no later than 2 months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms. Details are specified in the contract and warranty document.
Design and manufacture are based on the applicable EN 12953 series and pressure equipment legislation. The relevant subsidiary standards, conformity assessment and documentation scope are determined by the order’s technical file.
Coal and lignite; wood, pellets and suitably sized wood chips; olive pomace and agricultural biomass are considered. The fuel’s lower heating value (LHV) must be within 2,000–7,500 kcal/kg. A fuel’s name alone does not establish suitability; size, composition and analysis requirements are assessed together.
For both feeding options, fuel size must be above 8 mm. The upper limit is 500 mm for manual feeding and 35 mm for the underfeed stoker. Fuel selection and preparation must meet the size requirements of the feeding system used.
Solid fuel is transferred to the combustion zone by the underfeed stoker’s screw, driven by a gearbox. Feeding is controlled by setting operating and stop times on the control panel.
On a lower heating value (LHV) basis, the manufacturer’s stated general efficiency range is 65–75% for manual feeding and 75–85% for underfeed stoker feeding. These values depend on fuel, load and operating conditions; they should not be treated as fixed performance values under all conditions.
Delivery options include the boiler body alone or supply with auxiliary equipment, fittings and pipework. Mechanical installation, electrical and automation connections, initial startup and operator training are provided according to the contract scope. The exact supply and service scope is defined in the technical proposal and contract.
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Fully cylindrical · Scotch type · Three-pass · Fire-tube
Semi-cylindrical · Four-pass · Fire-tube
Coiled-tube · Water-tube steam generator
Semi-cylindrical · Three-pass · Fire-tube
FREE CONSULTATION
Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.
If you do not know the exact values, we can clarify your requirements together.