Solid-Fuel Steam Boiler

Kuvars Tek Külhanlı — Single furnace.

Steam power designed
around your process requirements.

Fully cylindrical, three-pass design. Manual or stoker fuel feeding. Engineered to order around your capacity and operating conditions.

STEAM OUTPUT RANGE300–3,000 kg/h
OPERATING PRESSURE1–16 barG
BOILER CONSTRUCTIONThree-passFire-tube
Manufacturing standardEN 12953
The stated values describe the series’ manufacturing range. The final combination of capacity and pressure is determined by an engineering assessment for each order.
DESIGN APPROACH

We design your boiler room as a complete system.

For Kuvars Tek Külhanlı, we assess your process steam requirements, operating pressure and daily load variations together. We design the boiler as part of a coordinated boiler room, integrating fuel preparation, combustion air, feedwater, steam distribution and the flue system.

For the single-furnace construction, we select manual loading or underfeed stoker feeding to suit the fuel and operating arrangements. For the stoker-fed version, we plan the boiler hopper, feed screw and combustion air together; for the manual version, we plan loading and ash removal access. Additional equipment such as a ground-level hopper and conveyor is included in the feeding line only when it forms part of the project scope.

We engineer feedwater treatment, pumping, steam discharge, condensate return and the necessary drain and blowdown lines together with the process installation. We ensure that water level and pressure control equipment is compatible with the boiler and feedwater system. Water quality, scale prevention and corrosion control form part of the operating plan.

The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. For solid-fuel operation, we also arrange fuel loading and ash removal areas to suit daily use. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.

Single furnaceFully cylindricalScotch typeFloor-standing
FUEL FEEDING OPTIONS

One series.
Two feeding options.

Both options offer a steam output range of 300–3,000 kg/h
across the series.

  1. Transfer to the hopper: Fuel from the main coal pit is transferred to the hopper by a screw conveyor.
  2. Feeding the burn pot: Fuel in the hopper is delivered from below to the burn pot by a feed screw driven by a geared motor.
  3. Air supply: The fresh air fan supplies air to the combustion zone through the outer air duct.
  4. Ignition: The operator ignites the fuel in the burn pot.
  5. Combustion with automatic feeding: Screw operating and stop times are set on the control panel; fuel and air supply maintain combustion.
  6. Ash and clinker formation: Ash and clinker accumulate around the burn pot as fuel burns.
  7. Cooling: After fuel feeding stops and combustion ends, the system is allowed to cool.
  8. Ash and clinker removal: Once the system has cooled, the operator removes the accumulated ash and clinker.

Small-capacity boilers do not have a screw conveyor transferring coal from the coal pit to the boiler hopper. This animation explains the system’s general operating principle. Equipment may vary according to the order scope.

TECHNICAL SPECIFICATIONS

Capacity, pressure
and boiler construction.

Within its fully cylindrical body, Kuvars Tek Külhanlı transfers heat from fuel combustion to water through a three-pass fire-tube construction. The sequence below describes the stoker feeding option; with manual feeding, the operator loads fuel onto the fixed grate.

Kuvars Tek Külhanlı technical specifications

Capacity and construction

Steam output300–3,000 kg/h
Operating pressure1–16 barG
Body and installationFully cylindrical · Scotch type · Floor-standing
Tube arrangementFire-tube
Number of flue gas passes3
Number of furnaces1
GrateAir-cooled, fixed
Fuel feedingManual / Underfeed stoker
ManufacturingEngineered to order
Product typeSolid-fuel steam boiler

Material standards

Boiler steels In high-pressure sections:EN 10028-2 grade P355GH, P295GH, P265GH and P235GH
Steel grades In non-pressurized or low-pressure sections:EN 10025-2 grade S355JR, S235JR
Fire and smoke tubesEN 10217-2 or EN 10216-2 grade P235GH

The series is engineered to order within a steam output range of 300–3,000 kg/h and an operating pressure range of 1–16 barG. These are the series limits for boilers manufactured at different capacities, not the load adjustment range of a single boiler. Final capacity, pressure and equipment scope are determined for each project.

Fuel storage and transfer to the hopper

In the stoker-fed arrangement, the fuel’s journey starts at the boiler hopper. If the system also has a ground-level hopper, the operator loads fuel there, and a screw conveyor or conveyor transfers it to the boiler hopper. If a level sensor is selected in the order, the transfer system starts automatically when the fuel level in the hopper falls.

The grate screen at the hopper inlet helps suitably sized fuel pass through. Sloping hopper surfaces help fuel flow towards the feeding point. An agitator may be used in the ground-level or boiler hopper, depending on fuel type and flow properties. Equipment such as the ground-level hopper, conveyor, sensor and agitator is specified according to the order scope.

Screw underfeeding and combustion air

Fuel drops from the hopper into the screw channel and travels to the burn pot on the feed screw driven by the gearbox. Fuel rises from inside the burn pot to reach the combustion bed. Air from the fresh air fan passes through a separate air passage surrounding the screw tube and is distributed to the burn pot’s air holes. Air warmed along this route meets the fuel in the combustion bed.

Combustion bed and ash and clinker formation

The operator performs initial ignition; fuel and air supply then maintain combustion. The spread and depth of the combustion bed are monitored during operation. An excessively thin bed can expose the feeding system to high temperatures.

Combustion produces ash; depending on fuel properties, some ash may fuse into clinker. Ash and clinker are removed after cooling on the front cooling grate. Inspection covers at the hopper–screw connection provide access to the fuel flow; maintenance covers around the fan and in front of the burn pot facilitate air passage checks and the removal of accumulated ash.

Three-pass flue gas path starting at the furnace

In the first pass, hot combustion gases travel along the furnace. They then reach the rear reversal chamber and are directed into the second-pass smoke tubes. The water-surrounded wet-back construction of this chamber helps transfer heat from the hot gases to the boiler water.

Gases from the second-pass tubes enter the front smoke box, change direction and enter the third-pass tubes. At the end of the third pass, they reach the rear smoke box and then the flue connection duct. Water-surrounded surfaces of the front and rear smoke boxes contribute to heat transfer; refractory lining on the outward-opening maintenance doors limits heat loss through those surfaces.

Cyclone, flue gas fan and discharge

The route after the flue connection is arranged according to the boiler room design. Gases flow directly to the chimney line or, if included in the system, to a single cyclone or multicyclone. The cyclone separates some of the solid particles carried by the gas and collects them in a hopper.

The flue gas fan draws gases through the boiler and any cyclone and delivers them to the chimney. Dampers in the ducts allow flow adjustment, while cyclone access covers provide access for cleaning and maintenance. Gases are finally discharged into the atmosphere through the chimney.

Heat transfer to water and steam generation

Energy from hot gases in the furnace and smoke tubes is transferred to the surrounding boiler water. As the water reaches the boiling temperature corresponding to the operating pressure, it turns into steam, which is used to meet process demand.

Water consumed during steam generation is replenished with feedwater. Internal water-guiding channels limit direct contact between cooler feedwater and the third-pass tubes, helping direct it towards hotter areas. This arrangement is intended to reduce flue gas condensation on cold surfaces and the associated corrosion risk.

Insulation and external cladding

The boiler body is insulated with glass wool or stone wool according to the design conditions. Durable external cladding over the insulation protects it from compression and external effects. This limits heat loss from the body to the surroundings and helps retain the generated energy within the boiler.

FUEL COMPATIBILITY

The right configuration
starts with your fuel.

Coal and lignite; wood, pellets and suitably sized wood chips; olive pomace and agricultural biomass may be considered when fuel requirements are met. Fuels containing plastic or unsuitable chemical additives are not accepted. A fuel’s name alone does not establish suitability; lower heating value, size, composition, moisture content and analysis requirements are assessed together.

Coal / LigniteWood / PelletsAgricultural biomass
Open the unit converter
SOLID FUELS · IEA · LOWER HEATING VALUE≈ 1,959–8,431 kcal/kg

Solid-fuel and feeding requirements

The product’s current project assessment range is 2,000–7,500 kcal/kg; this is separate from the typical values in the IEA table. Required fuel size: Above 8 mm . The maximum is 500 mm for manual feeding and 35 mm for stoker feeding.

When lower heating value changes, capacity may change too

All other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. Fuel moisture and ash content also affect combustion. The feeding system, combustion chamber, grate, heat transfer surfaces and boiler dimensions are therefore determined for the selected fuel.

At ENORPA, we design the boiler around the selected fuel and target capacity. A boiler cannot deliver the same thermal output with every solid fuel; achievable capacity is assessed together with the fuel analysis and feeding system.

Explore the heating values of different fuels
ENORPA 360° SUPPORT

From the first conversation throughout your equipment’s life.

We identify your needs together
and support you at every stage.

360°
ENORPA
SUPPORT SHIELD

Comprehensive support in four stages.
One engineering approach.

01 ANALYSIS & CONSULTANCY

The right decision
starts with an expert.

Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.

02 CUSTOM MANUFACTURING & SUPPLY

Tailored to your needs.
Built for you.

Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.

03 INSTALLATION & COMMISSIONING

We install it. Get it running.
Prepare your team.

We install and commission the products you purchase from us, then train your personnel in their use and operation.

04 LIFETIME TECHNICAL SUPPORT

As your equipment keeps working,
our support continues.

When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.

FREQUENTLY ASKED QUESTIONS

Before you
decide.

Can it be manufactured for the intermediate capacity I need?

Kuvars Tek Külhanlı is engineered to order within an output range of 300–3,000 kg/h. The requested combination of capacity and pressure is finalized through an engineering assessment.

Do the manual and stoker feeding options have different capacities?

Both options have the same output range. Fuel size limits and the stated general efficiency ranges differ. Manual fuel loading does not mean that boiler control is also manual.

Is an economizer included in the delivery?

An economizer is optional; suitability is assessed according to project and fuel conditions. Auxiliary equipment is not automatically included in every sale. No claim is made that a condenser is suitable for the solid-fuel Kuvars Tek application.

When does the warranty begin?

ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The period starts on the actual commissioning date accepted by ENORPA, but no later than 2 months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms. Details are specified in the contract and warranty document.

How are standards and conformity documents determined?

Design and manufacture are based on the applicable EN 12953 series and pressure equipment legislation. The relevant subsidiary standards, conformity assessment and documentation scope are determined by the order’s technical file.

Which fuels are suitable for Kuvars Tek Külhanlı?

Coal and lignite; wood, pellets and suitably sized wood chips; olive pomace and agricultural biomass are considered. The fuel’s lower heating value (LHV) must be within 2,000–7,500 kcal/kg. A fuel’s name alone does not establish suitability; size, composition and analysis requirements are assessed together.

What fuel sizes are required for manual and stoker feeding?

For both feeding options, fuel size must be above 8 mm. The upper limit is 500 mm for manual feeding and 35 mm for the underfeed stoker. Fuel selection and preparation must meet the size requirements of the feeding system used.

How does the stoker system feed fuel, and how is it adjusted?

Solid fuel is transferred to the combustion zone by the underfeed stoker’s screw, driven by a gearbox. Feeding is controlled by setting operating and stop times on the control panel.

What efficiencies are stated for the manual and stoker feeding options?

On a lower heating value (LHV) basis, the manufacturer’s stated general efficiency range is 65–75% for manual feeding and 75–85% for underfeed stoker feeding. These values depend on fuel, load and operating conditions; they should not be treated as fixed performance values under all conditions.

What is included in delivery and installation?

Delivery options include the boiler body alone or supply with auxiliary equipment, fittings and pipework. Mechanical installation, electrical and automation connections, initial startup and operator training are provided according to the contract scope. The exact supply and service scope is defined in the technical proposal and contract.

SAME PRODUCT FAMILY

Explore other steam solutions.

FREE CONSULTATION

Let’s plan your Kuvars Tek Külhanlı project together.

Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.

We can start with this information, if available

  • Steam requirement · kg/h
  • Operating pressure · barG
  • Solid-fuel type and properties
  • Manual or stoker feeding preference

If you do not know the exact values, we can clarify your requirements together.