Solid/Liquid/Gas-Fuelled Steam Boiler

Turmalin.

A steam solution suited to your fuel choice.

For solid fuel: a moving grate with water and air cooling, clinker crushing and ash discharge system. Switching between fuels is possible; different fuels are not burned simultaneously.

Steam output rangeSolid fuel: 2,000–5,000 kg/hLiquid/gas fuel: 2,000–9,000 kg/h
Operating pressure1–14 barG
FuelSolid / liquid / gas fuel
Manufacturing standardEN 12953
DESIGN APPROACH

We design your boiler room as a complete system.

For Turmalin, we assess your process steam requirements, operating pressure and daily load variations together. We design the boiler as part of a coordinated boiler room, integrating fuel preparation, combustion air, feedwater, steam distribution and the flue system.

For solid-fuel operation, we treat the ground-level hopper, transfer screw or conveyor belt, and boiler hopper as a complete feeding line. We plan the arrangement of the hydraulic forward-pushing ram, moving grate with water and air cooling, clinker crusher and ash collection section together. Combustion air, the multicyclone option, the flue gas fan and the flue system are assessed together as part of the project. For liquid or gaseous fuel operation, burner compatibility and fuel pipework are specified separately; we do not design on the assumption that different fuels will be burned simultaneously.

We engineer feedwater treatment, pumping, steam discharge, condensate return and the necessary drain and blowdown lines together with the process installation. We ensure that water level and pressure control equipment is compatible with the boiler and feedwater system. Water quality, scale prevention and corrosion control form part of the operating plan.

The layout accounts for maintenance door opening, service clearances, ventilation and operator access to the controls. For solid-fuel operation, we also arrange fuel loading and ash removal areas to suit daily use. This allows us to plan the system as a whole, from installation through operation and maintenance. Final capacity, equipment selection and scope of supply are determined for each project and order.

Semi-cylindricalFour-passFire-tube

Boiler room equipment

Click a number in the drawing to see the equipment name.
Turmalin boiler room · Front isometric view 1. Chimney 1 2. Chimney anchor plate and anchors 2 3. Flue gas fan connection duct 3 4. Flue gas fan 4 5. Connecting duct between multicyclone and flue gas fan 5 6. Multicyclone 6 7. Connecting duct between multicyclone and boiler 7 8. Rear smoke box 8 9. Gas-side pressure relief flap 9 10. Boiler guardrails and platforms 10 11. Boiler body 11 12. Pressure and temperature measurement manifold and accessories 12 13. Fresh air fan 13 14. Condensate tank 14 15. Water level control chamber 15 16. Feedwater pumping station — not visible in this view 16 17. Water softening system — not visible in this view 17 18. Steam manifold — not visible in this view 18 19. Condensate manifold — not visible in this view 19 20. Steam manifold steam trap circuit — not visible in this view 20 21. Bottom blowdown — not visible in this view 21 22. Surface blowdown — not visible in this view 22 23. Ground-level hopper — not visible in this view 23 24. Fuel transfer screw from ground-level hopper to boiler hopper — not visible in this view 24
Turmalin boiler room layout. Equipment and scope of supply are determined for each project.Equipment numbered 16–24 is not visible in the layout. It is offered in the standard quotation.

Boiler room equipment

Click a number in the drawing to see the equipment name.
Turmalin boiler room · Front isometric view 1. Chimney 1 2. Chimney anchor plate and anchors 2 3. Flue gas fan connection duct 3 4. Flue gas fan 4 5. Connecting duct between multicyclone and flue gas fan 5 6. Multicyclone 6 7. Connecting duct between multicyclone and boiler 7 8. Rear smoke box 8 9. Gas-side pressure relief flap 9 10. Boiler guardrails and platforms 10 11. Boiler body 11 12. Pressure and temperature measurement manifold and accessories 12 13. Fresh air fan 13 14. Condensate tank 14 15. Water level control chamber 15 16. Feedwater pumping station — not visible in this view 16 17. Water softening system — not visible in this view 17 18. Steam manifold — not visible in this view 18 19. Condensate manifold — not visible in this view 19 20. Steam manifold steam trap circuit — not visible in this view 20 21. Bottom blowdown — not visible in this view 21 22. Surface blowdown — not visible in this view 22 23. Ground-level hopper — not visible in this view 23 24. Fuel transfer screw from ground-level hopper to boiler hopper — not visible in this view 24
Equipment numbered 16–24 is not visible in the layout. It is offered in the standard quotation.
FUEL FEEDING & COMBUSTION

An operating arrangement
suited to your fuel.

Solid-fuel feeding

  1. Transfer from the ground-level hopper: Coal is transferred from the ground-level hopper to the top of the boiler hopper by an inclined trough screw conveyor.
  2. Top loading into the boiler hopper: Coal discharged from the screw falls into the hopper and moves down to the ram feeder inlet under gravity.
  3. Forward feeding by hydraulic ram: The ram pushes coal onto the start of the grate; when it retracts, space opens for fresh fuel.
  4. Fresh air distribution at four points: The fan distributes fresh air through four separate outlets into the space beneath the grate. Air passes through the grate openings to reach the fuel bed.
  5. Drying and preheating: In the first section of the grate, fuel heats up, loses moisture and is prepared for ignition.
  6. Ignition: In the second section, the preheated fuel ignites and a flame begins to form.
  7. Combustion: Combustion intensifies in the third section. The moving grate gradually advances the fuel, while the air supply supports combustion.
  8. Burnout and cooling: In the fourth section, combustion ends and the flames go out. The remaining ash and clinker begin to cool as they move towards the end of the grate.
  9. Crushing and ash collection: Residues at the end of the grate fall into the crusher. Counter-rotating rollers reduce large pieces; ash and crushed clinker collect in the ash trolley below.
TECHNICAL SPECIFICATIONS

Capacity, pressure
and boiler construction.

Turmalin is designed for steam generation with a semi-cylindrical, four-pass, fire-tube construction. Fuel preparation, combustion and heat transfer are engineered together around the selected capacity and the facility’s operating conditions.

Turmalin technical specifications

Capacity and construction

Steam output rangeSolid fuel: 2,000–5,000 kg/h
Liquid/gas fuel: 2,000–9,000 kg/h
Operating pressure1–14 barG
ConstructionSemi-cylindrical · Four-pass · Fire-tube
FuelSolid / liquid / gas fuel
Fuel feeding / combustionTop-fed hydraulic ram feeding or burner
Solid-fuel lower heating value2,000–7,500 kcal/kg
Minimum fuel particle sizeAbove 8 mm
Maximum fuel sizeUp to 120 mm with hydraulic feeding
ManufacturingEngineered to order
Product familySteam Boilers & Generators

Material standards

Boiler steels In high-pressure sections:EN 10028-2 grade P355GH, P295GH, P265GH and P235GH
Steel grades In non-pressurized or low-pressure sections:EN 10025-2 grade S355JR, S235JR
Fire and smoke tubesEN 10217-2 or EN 10216-2 grade P235GH

The series is engineered to order within steam output ranges of 2,000–5,000 kg/h for solid fuel and 2,000–9,000 kg/h for liquid/gas fuel, and an operating pressure range of 1–14 barG. These are the series limits for units manufactured at different capacities, not the load adjustment range of a single unit. Final capacity, operating conditions and equipment scope are determined for each project.

Fuel storage and transfer to the boiler hopper

Solid fuel is delivered to the boiler hopper from a storage area suited to the site layout. If the system includes a ground-level hopper, a screw conveyor or conveyor belt transfers fuel between these two points. Fuel loaded into the hopper from above moves towards the feeder inlet.

Fuel moisture, ash content, size and flow properties are considered when selecting the transfer line. The ground-level hopper, agitator, level sensor and conveying equipment are specified according to the order scope.

Hydraulic ram feeding and combustion on the moving grate

The hydraulic ram pushes fuel from the hopper outlet onto the start of the grate. Fixed and moving grate elements work together to advance the fuel bed gradually. Combustion air is distributed beneath the grate and supplied to the fuel bed.

Fuel heats up and loses moisture in the first zone; ignition and intensive combustion take place in the subsequent zones. Towards the end of the grate, combustion is completed and the residues begin to cool. The moving grate with water and air cooling forms part of this fuel movement and combustion arrangement.

Clinker crushing and ash collection

Ash and clinker formed during combustion are transferred from the end of the grate to the crusher. The crusher reduces large residues; crushed clinker and ash are carried through the discharge line to the collection section. In the animated arrangement, this section is an ash trolley.

Ash quantity and clinker formation depend on fuel properties. Access areas required for collection, emptying and maintenance are planned together with the boiler room layout.

Burner operation with liquid or gaseous fuel

In the burner-fired version, liquid or gaseous fuel is delivered to the burner through a preparation and supply line suited to the fuel. The burner fan provides combustion air; ignition, flame supervision and fuel–air adjustment are managed by the selected burner’s automation system.

Switching between solid-fuel and burner operation is possible; different fuels are not burned simultaneously. The changeover must not be assumed to be automatic or uninterrupted. Burner compatibility, connections and changeover conditions are specified as part of the project.

Four-pass fire and flue gas path

Hot gases from the combustion chamber travel through the four-pass fire-tube construction. Reversal sections direct the gases into the next pass, allowing them to contact the heat transfer surfaces before reaching the outlet.

Energy from the hot gases is transferred to the boiler water surrounding the fire and smoke tubes and combustion surfaces. Cleaning the flue gas passages, checking deposits on heat transfer surfaces and providing maintenance access form part of the operating plan.

Flue gas discharge and auxiliary equipment

For solid-fuel operation, a multicyclone is available as an option for the flue gas line. It separates some of the solid particles carried by the gas and collects them in a hopper. Equipment scope is determined for each project. Flue and duct dimensions, gas flow rate and system pressure losses are assessed together.

Where a flue gas fan is required, it is selected for the combined resistance of the boiler and auxiliary equipment. Fan, damper and cleaning access arrangements are determined for each project; auxiliary equipment must not automatically be assumed to be included in standard delivery.

Feedwater and steam generation

Water surrounding the heat transfer surfaces turns into steam when it reaches the boiling temperature corresponding to the operating pressure. The steam is supplied to the process line, and the feedwater system replenishes the water used. Pressure and feedwater control and safety equipment are arranged according to the selected design.

Feedwater quality is important for controlling scale formation and corrosion on heat transfer surfaces. Water treatment, condensate return and the necessary drain and blowdown arrangements are engineered around site conditions. Operation and maintenance must follow the product’s instructions.

Insulation, external cladding and maintenance access

To limit heat loss, hot surfaces are protected with insulation and external cladding suited to the design conditions. Insulation material, thickness and cladding details are determined by operating temperature and order scope.

Maintenance access must be provided to the combustion system, heat transfer surfaces and flue connections. Service clearances around equipment, door opening directions and cleaning areas are considered when preparing the facility layout.

FUEL COMPATIBILITY

The right configuration
starts with your fuel.

Solid fuels

Coal and lignite; wood, pellets and suitably sized wood chips; olive pomace and agricultural biomass may be considered when fuel requirements are met. Fuels containing plastic or unsuitable chemical additives are not accepted. A fuel’s name alone does not establish suitability; lower heating value, size, composition, moisture content and analysis requirements are assessed together.

Coal / LigniteWood / Pellets / Wood chipsOlive pomace / Agricultural biomass

Liquid and gaseous fuels

A suitable burner and preparation system are selected for natural gas, LNG, CNG, LPG, diesel and fuel oil. For methane and biogas, gas composition, treatment requirements and burner compatibility are assessed separately. A single burner must not be assumed to support every fuel.

Natural gas / LNG / CNGLPGDiesel / Fuel oilMethaneBiogas

Switching between solid fuel and liquid/gas fuel is possible; different fuels are not burned simultaneously. The changeover must not be assumed to be automatic or uninterrupted.

Open the unit converter
SOLID FUELS · IEA · LOWER HEATING VALUE≈ 1,959–8,431 kcal/kg

Solid-fuel and feeding requirements

The product’s current project assessment range is 2,000–7,500 kcal/kg; this is separate from the typical values in the IEA table. Fuel size must be above 8 mm. With hydraulic feeding, the maximum is 120 mm.

LIQUID / GASEOUS FUELS · IEA · LOWER HEATING VALUE41.57–50.03 MJ/kg

When lower heating value changes, capacity may change too

All other conditions being equal, more of a fuel with a lower heating value must be burned to meet the same heat demand. This affects fuel feeding, the combustion chamber, heat transfer surfaces and, at the design stage, boiler dimensions.

At ENORPA, we design the boiler around the selected fuel and target capacity. An existing boiler cannot deliver the same thermal output with every fuel. Achievable capacity is determined by assessing fuel properties, the burner or feeding system, and boiler design together.

Explore the heating values of different fuels
ENORPA 360° SUPPORT

From the first conversation throughout your equipment’s life.

We identify your needs together
and support you at every stage.

360°
ENORPA
SUPPORT SHIELD

Comprehensive support in four stages.
One engineering approach.

01 ANALYSIS & CONSULTANCY

The right decision
starts with an expert.

Speak directly with our specialist engineers and receive free advice. Let’s analyse your needs together and identify the right product and capacity for you.

02 CUSTOM MANUFACTURING & SUPPLY

Tailored to your needs.
Built for you.

Let’s turn your technical requirements into equipment made for you. We manufacture and supply your product and the necessary equipment to meet your specific needs.

03 INSTALLATION & COMMISSIONING

We install it. Get it running.
Prepare your team.

We install and commission the products you purchase from us, then train your personnel in their use and operation.

04 LIFETIME TECHNICAL SUPPORT

As your equipment keeps working,
our support continues.

When a fault occurs, we support you through our contracted local service providers or a technical team dispatched from our headquarters, depending on the nature of the issue. We provide technical support throughout the life of your equipment.

FREQUENTLY ASKED QUESTIONS

Before you
decide.

Can Turmalin be manufactured for an intermediate capacity?

Within the series’ output ranges of Solid fuel: 2,000–5,000 kg/h | Liquid/gas fuel: 2,000–9,000 kg/h, a suitable capacity is engineered by assessing your requirements, fuel and operating conditions together.

Which feeding or combustion system is used?

Top-fed hydraulic ram feeding or burner. For solid fuel: a moving grate with water and air cooling, clinker crushing and ash discharge system. Switching between fuels is possible; different fuels are not burned simultaneously.

Can different fuels be burned at the same time?

No. Switching between solid fuel and liquid/gas fuel is possible, but simultaneous combustion is not used. Output ranges differ by fuel and are listed separately in the technical table.

Which equipment is included in the delivery?

You can choose the boiler body alone, supply with auxiliary equipment, or a solution covering the boiler room. Whether the burner, feeding system, control panel, pumps, fans, flue and other equipment are included is specified individually in the technical proposal.

Are installation and personnel training provided?

Installation, electrical and automation connections, commissioning and operator training are planned according to the project’s service scope. The boundaries of the work are defined in the technical proposal and contract.

When does the warranty begin?

ENORPA-manufactured products carry a 24-month warranty against manufacturing defects. The warranty starts on the actual commissioning date accepted by ENORPA, but no later than two calendar months after delivery. Third-party equipment is subject to the relevant manufacturer’s warranty terms; ENORPA provides coordination.

How are documentation and conformity requirements determined?

The product’s operating conditions, configuration and project requirements form the basis of the assessment. The applicable documentation and scope of conformity are clarified in the order’s technical file.

How is technical support provided abroad?

Depending on the project and country conditions, local teams working under ENORPA supervision may be considered. A contracted local service provider or a technical team from Türkiye is assigned according to the nature of the fault. Service terms are defined in the contract.

Is an economizer included in the delivery?

An economizer is not assumed to be included as standard. Its suitability for the fuel and operating conditions is assessed, and any selected heat recovery equipment is listed separately in the technical proposal.

SAME PRODUCT FAMILY

Explore other steam solutions.

FREE CONSULTATION

Let’s plan your Turmalin project together.

Share your requirements with our engineers. Let’s clarify the fuel, capacity, site conditions and scope of supply together.

We can start with this information, if available

  • Target steam demand for each fuel · kg/h
  • Operating pressure · barG
  • Fuels to be used and any changeover requirements

If you do not know the exact values, we can clarify your requirements together.