ENORPA

Heat treatment solutions for pallets and wood packaging.

Let’s assess hot air and hot water sources for pallet and wood packaging heat treatment chambers according to your facility’s treatment requirements.

Product images: Industrial air heaters · Hot water and high-temperature hot water boilers. These are not presented as reference projects in this industry.

Our approach.

The purpose of heat treatment for wood packaging

Heat treatment of pallets and other wood packaging materials is intended to reduce the risk of transporting harmful organisms. Treatment and marking conditions for export packaging are considered within the applicable ISPM 15 requirements and the procedures of the competent organisations.

A treatment objective distinct from drying

Drying adjusts wood moisture content to suit its intended use; heat treatment focuses on the material reaching the required treatment conditions. Heating the chamber air alone does not show that treatment is complete. Load characteristics, measurement points and treatment records should be assessed within the authorised treatment procedure.

Hot air and hot water options

A heat treatment chamber can be heated through a suitable hot air supply or air heaters supplied with hot water. The chamber structure, loading arrangement and air circulation affect which heat source is suitable. Let’s select the boiler according to the thermal load and operating conditions specified for the chamber equipment.

Loading and cycle planning

Pallet dimensions, wood cross-sections, batch quantity, stacking arrangement and the number of daily cycles are the starting information for capacity assessment. Let’s also examine chamber insulation, door openings and simultaneous operation of multiple chambers. We can clarify the treatment schedule with the authorised facility and equipment specialists.

Products to consider

Supply and implementation responsibilities

Supplying the boiler and auxiliary equipment is a separate responsibility from validating the chamber’s treatment process and obtaining marking authorisation. Purchasing a boiler alone does not grant authorisation to apply the ISPM 15 mark. Let’s define the scope of heating infrastructure, installation, commissioning and service at the quotation stage.